IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0047 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $3,685 Not Implemented
IC0047 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,404 $1,215 Implemented
IC0047 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $358 $900 Implemented
IC0047 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $467 $0 Not Implemented
IC0047 # 06 Y:2002 06 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $960 $160 Implemented
IC0032 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,691 $123,310 Not Implemented
IC0032 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,926 $61,950 Not Implemented
IC0032 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $20,124 Not Implemented
IC0032 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,454 $19,500 Implemented
IC0032 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $15,584 $19,500 Not Implemented
IC0032 # 06 Y:2002 06 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $25,500 $132,960 Not Implemented
IC0032 # 07 Y:2002 07 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $61,700 $96,030 Not Implemented
IC0032 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $25,360 $8,080 Not Implemented
IC0032 # 09 Y:2002 09 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $90,684 $65,000 Not Implemented
WI0356 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,392 $162,000 Not Implemented
WI0356 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,279 $58,100 Not Implemented
WI0356 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,328 $3,182 Not Implemented
WI0356 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,610 $3,150 Not Implemented
WI0356 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $666 Not Implemented
WI0356 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,408 $640 Implemented
WI0356 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,364 $0 Not Implemented
WI0356 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,469 $500 Not Implemented
WI0356 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $3,856 Implemented
WI0356 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $105 $0 Implemented
BD0116 # 01 Y:1998 01 1998 USE RADIANT HEATER FOR SPOT HEATING $11,925 $16,000 Implemented