IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0019 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,007 $800 Implemented
UM0457 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $162,816 $1,000 Implemented
UM0420 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,994 $1,000 Implemented
UM0420 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,312 $200 Implemented
UM0420 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,821 $1,000 Implemented
UM0420 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $3,958 $500 Implemented
IC0163 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $635 $538 Implemented
IC0163 # 10 Y:2009 10 2009 $1,689,703 $0 Implemented
IC0163 # 08 Y:2009 08 2009 RECYCLE WHITE WATER $2,034 $771 Implemented
IC0163 # 07 Y:2009 07 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,925 $17,000 Implemented
IC0163 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $528 $332 Implemented
IC0163 # 03 Y:2009 03 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,314 $102 Implemented
UM0329 # 02 Y:2007 02 2007 COVER OPEN TANKS $115,389 $140,000 Implemented
UM0329 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,880 $39,375 Implemented
UM0329 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,455 $6,300 Implemented
UM0326 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,092 $204 Implemented
UM0326 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,476 $2,200 Implemented
UM0326 # 03 Y:2007 03 2007 COVER OPEN TANKS $4,631 $220 Implemented
UM0326 # 02 Y:2007 02 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $8,825 $13,130 Implemented
UM0326 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,591 $500 Implemented
UM0326 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,234 $675 Implemented
UM0326 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $1,860 Implemented
UM0326 # 09 Y:2007 09 2007 INSTALL OCCUPANCY SENSORS $253 $600 Implemented
UM0307 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,621 $1,500 Implemented
UM0307 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,428 $2,000 Implemented