Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0331 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,781 | $1,000 | Implemented |
OR0331 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,374,400 | $105,000 | Implemented |
OR0331 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PLANT POWER FACTOR | $0 | $136,000 | Not Implemented |
OR0331 # 04 Y:1998 | 04 | 1998 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $14,990 | $79,750 | Not Implemented |
OR0331 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $78,861 | $26,602 | Not Implemented |
AM0332 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $2,665 | Implemented |
AM0332 # 09 Y:1998 | 09 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $380 | $0 | Implemented |
AM0332 # 07 Y:1998 | 07 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $460 | $0 | Implemented |
AM0332 # 08 Y:1998 | 08 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $380 | $0 | Implemented |
AM0332 # 10 Y:1998 | 10 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $350 | $20 | Implemented |
AM0332 # 01 Y:1998 | 01 | 1998 | METER WASTE WATER | $7,230 | $8,500 | Implemented |
AM0332 # 03 Y:1998 | 03 | 1998 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $2,605 | $3,090 | Not Implemented |
AM0332 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $830 | $100 | Not Implemented |
AM0332 # 06 Y:1998 | 06 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $775 | $1,200 | Implemented |
AM0332 # 02 Y:1998 | 02 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $6,620 | $16,675 | Implemented |
MA0421 # 02 Y:1998 | 02 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $77,003 | $200,000 | Not Implemented |
MA0421 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,501 | $22,284 | Not Implemented |
MA0421 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,397 | $5,000 | Not Implemented |
MA0421 # 01 Y:1998 | 01 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $471,027 | $984,000 | Not Implemented |
MA0421 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,035 | $9,615 | Not Implemented |
MA0421 # 07 Y:1998 | 07 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $917 | $8,530 | Not Implemented |
MA0421 # 08 Y:1998 | 08 | 1998 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $268 | $472 | Not Implemented |
MA0421 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,867 | $0 | Not Implemented |
OR0328 # 04 Y:1998 | 04 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,552 | $8,650 | Not Implemented |
OR0328 # 05 Y:1998 | 05 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,386 | $0 | Implemented |