IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $0 $136,000 Not Implemented
OR0331 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $14,990 $79,750 Not Implemented
OR0331 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $78,861 $26,602 Not Implemented
AM0332 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $2,665 Implemented
AM0332 # 09 Y:1998 09 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $380 $0 Implemented
AM0332 # 07 Y:1998 07 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $460 $0 Implemented
AM0332 # 08 Y:1998 08 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $380 $0 Implemented
AM0332 # 10 Y:1998 10 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $350 $20 Implemented
AM0332 # 01 Y:1998 01 1998 METER WASTE WATER $7,230 $8,500 Implemented
AM0332 # 03 Y:1998 03 1998 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) $2,605 $3,090 Not Implemented
AM0332 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $830 $100 Not Implemented
AM0332 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $775 $1,200 Implemented
AM0332 # 02 Y:1998 02 1998 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS $6,620 $16,675 Implemented
MA0421 # 02 Y:1998 02 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $77,003 $200,000 Not Implemented
MA0421 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,501 $22,284 Not Implemented
MA0421 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,397 $5,000 Not Implemented
MA0421 # 01 Y:1998 01 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $471,027 $984,000 Not Implemented
MA0421 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,035 $9,615 Not Implemented
MA0421 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $917 $8,530 Not Implemented
MA0421 # 08 Y:1998 08 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $268 $472 Not Implemented
MA0421 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,867 $0 Not Implemented
OR0328 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,552 $8,650 Not Implemented
OR0328 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,386 $0 Implemented