IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0019 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,007 $800 Implemented
UM0457 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $162,816 $1,000 Implemented
UM0329 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,455 $6,300 Implemented
UM0329 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,880 $39,375 Implemented
UM0329 # 02 Y:2007 02 2007 COVER OPEN TANKS $115,389 $140,000 Implemented
UM0307 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $75 Implemented
UM0307 # 12 Y:2006 12 2006 INSULATE BARE EQUIPMENT $3,085 $0 Implemented
UM0307 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $3,606 $1,191 Implemented
UM0307 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,814 $10,054 Implemented
UM0307 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,428 $2,000 Implemented
UM0307 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,621 $1,500 Implemented
UM0307 # 05 Y:2006 05 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $19,061 $5,066 Implemented
UM0307 # 04 Y:2006 04 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $55,043 $2,400 Implemented
UM0307 # 03 Y:2006 03 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $63,131 $0 Implemented
UM0307 # 01 Y:2006 01 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $302,929 $70,000 Implemented
UM0169 # 08 Y:2000 08 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $50,433 $23,500 Implemented
UM0169 # 06 Y:2000 06 2000 USE RADIANT HEATER FOR SPOT HEATING $8,102 $10,000 Implemented
UM0169 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,117 $500 Implemented
UM0169 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,322 $800 Implemented
UM0169 # 01 Y:2000 01 2000 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $15,444 $2,250 Implemented
UM0168 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $8,180 $300 Implemented
UM0168 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,945 $2,250 Implemented
UM0168 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $993 Implemented
ND0346 # 14 Y:2000 14 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64 $10 Implemented
ND0346 # 12 Y:2000 12 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,827 $320 Implemented