IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0571 # 05 Y:1999 05 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $18,667 $0 Not Implemented
UD0571 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,800 $0 Not Implemented
UD0571 # 07 Y:1999 07 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,000 $24,000 Not Implemented
UD0571 # 08 Y:1999 08 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,582 $0 Implemented
UD0571 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,489 $0 Not Implemented
UD0563 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $29,762 $4,400 Not Implemented
UD0563 # 02 Y:1999 02 1999 ELIMINATE/REDUCE AN OPERATION $30,000 $6,648 Not Implemented
UD0563 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,365 $31,000 Implemented
UD0563 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,536 $3,000 Not Implemented
UD0563 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,707 $550 Not Implemented
UD0563 # 06 Y:1999 06 1999 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $13,484 $2,645 Not Implemented
UD0563 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $9,270 Implemented
UD0563 # 08 Y:1999 08 1999 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,880 $8,471 Not Implemented
UD0555 # 01 Y:1998 01 1998 EXPAND OPERATIONS INTO UNUSED SPACE $237,283 $1,313,000 Implemented
UD0555 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $123,160 $115,000 Not Implemented
UD0555 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $22,667 $20,000 Not Implemented
UD0555 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $17,490 $0 Implemented
UD0555 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,454 $0 Implemented
UD0555 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $17,546 Implemented
UD0236 # 01 Y:1987 01 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $102,264 $500,000 Not Implemented
UD0236 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,157 $0 Implemented
UD0236 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,089 $2,400 Not Implemented
UD0236 # 04 Y:1987 04 1987 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,699 $28,000 Not Implemented
UD0210 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,091 $20,000 Implemented
UD0210 # 02 Y:1986 02 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,025 $1,250 Implemented