Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 3322 | Malleable Iron Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0416 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $243 | $472 | Implemented |
MA0416 # 03 Y:1998 | 03 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,884 | $1,000 | Implemented |
MA0416 # 02 Y:1998 | 02 | 1998 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $13,356 | $2,000 | Implemented |
MA0416 # 01 Y:1998 | 01 | 1998 | ELIMINATE SHIFT | $145,100 | $250,000 | Implemented |
HO0174 # 07 Y:1998 | 07 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,800 | $0 | Not Implemented |
HO0174 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $7,800 | $8,000 | Not Implemented |
HO0174 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $4,561 | $7,680 | Not Implemented |
HO0174 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,918 | $1,500 | Implemented |
HO0174 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $875 | $2,308 | Not Implemented |
HO0174 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,898 | $20,287 | Implemented |
HO0174 # 06 Y:1998 | 06 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $24,960 | $5,000 | Not Implemented |
HO0174 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,300 | $0 | Implemented |
MA0404 # 05 Y:1997 | 05 | 1997 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $0 | $0 | Implemented |
MA0404 # 04 Y:1997 | 04 | 1997 | USE OTHER METHODS FOR NEUTRALIZATION | $34,200 | $0 | Not Implemented |
MA0404 # 03 Y:1997 | 03 | 1997 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $12,933 | $71,400 | Implemented |
MA0404 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,416 | $16,505 | Not Implemented |
MA0404 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $412,115 | $1,000,000 | Implemented |
AM0113 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $340 | $290 | Implemented |
AM0113 # 04 Y:1991 | 04 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $2,815 | $400 | Implemented |
AM0113 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,300 | $280 | Implemented |
AM0113 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,390 | $88,900 | Implemented |
AM0113 # 01 Y:1991 | 01 | 1991 | USE UTILITY CONTROLLED POWER MANAGEMENT | $687,000 | $250,000 | Implemented |
AT0026 # 03 Y:1985 | 03 | 1985 | INSTALL SET-BACK TIMERS | $3,360 | $0 | Not Implemented |
AT0026 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,799 | $4,500 | Not Implemented |
AT0026 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $258 | $192 | Not Implemented |