IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0354 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $4,125 $6,715 Not Implemented
AM0354 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,240 Implemented
AM0354 # 04 Y:1999 04 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $435 $150 Not Implemented
AM0354 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $375 $0 Implemented
AM0354 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $370 $0 Not Implemented
AM0354 # 07 Y:1999 07 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $280 $0 Implemented
AM0354 # 08 Y:1999 08 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $250 $0 Implemented
AM0354 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $185 $0 Not Implemented
WI0356 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,392 $162,000 Not Implemented
WI0356 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,279 $58,100 Not Implemented
WI0356 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,328 $3,182 Not Implemented
WI0356 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,610 $3,150 Not Implemented
WI0356 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $666 Not Implemented
WI0356 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,408 $640 Implemented
WI0356 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,364 $0 Not Implemented
WI0356 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,469 $500 Not Implemented
WI0356 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $3,856 Implemented
WI0356 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $105 $0 Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
OR0331 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $78,861 $26,602 Not Implemented
OR0331 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $14,990 $79,750 Not Implemented
OR0331 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $0 $136,000 Not Implemented
AM0332 # 01 Y:1998 01 1998 METER WASTE WATER $7,230 $8,500 Implemented
AM0332 # 02 Y:1998 02 1998 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS $6,620 $16,675 Implemented