Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
596
matching recommendationsSIC | 3325 | Steel Foundries, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0354 # 02 Y:1999 | 02 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $4,125 | $6,715 | Not Implemented |
AM0354 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,500 | $1,240 | Implemented |
AM0354 # 04 Y:1999 | 04 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $435 | $150 | Not Implemented |
AM0354 # 05 Y:1999 | 05 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $375 | $0 | Implemented |
AM0354 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $370 | $0 | Not Implemented |
AM0354 # 07 Y:1999 | 07 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $280 | $0 | Implemented |
AM0354 # 08 Y:1999 | 08 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $250 | $0 | Implemented |
AM0354 # 09 Y:1999 | 09 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $185 | $0 | Not Implemented |
WI0356 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $77,392 | $162,000 | Not Implemented |
WI0356 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,279 | $58,100 | Not Implemented |
WI0356 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,328 | $3,182 | Not Implemented |
WI0356 # 04 Y:1999 | 04 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,610 | $3,150 | Not Implemented |
WI0356 # 05 Y:1999 | 05 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $223 | $666 | Not Implemented |
WI0356 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,408 | $640 | Implemented |
WI0356 # 07 Y:1999 | 07 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,364 | $0 | Not Implemented |
WI0356 # 08 Y:1999 | 08 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,469 | $500 | Not Implemented |
WI0356 # 09 Y:1999 | 09 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,205 | $3,856 | Implemented |
WI0356 # 10 Y:1999 | 10 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $105 | $0 | Implemented |
OR0331 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,374,400 | $105,000 | Implemented |
OR0331 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,781 | $1,000 | Implemented |
OR0331 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $78,861 | $26,602 | Not Implemented |
OR0331 # 04 Y:1998 | 04 | 1998 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $14,990 | $79,750 | Not Implemented |
OR0331 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PLANT POWER FACTOR | $0 | $136,000 | Not Implemented |
AM0332 # 01 Y:1998 | 01 | 1998 | METER WASTE WATER | $7,230 | $8,500 | Implemented |
AM0332 # 02 Y:1998 | 02 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $6,620 | $16,675 | Implemented |