IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 333 Primary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0341 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,960 $9,373 Implemented
SF0341 # 07 Y:2007 07 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,686 $15,000 Implemented
SF0341 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $1,620 Implemented
SF0341 # 09 Y:2007 09 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $51,342 $60,000 Implemented
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
MI0067 # 01 Y:2003 01 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $420 $726 Implemented
MI0067 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $1,681 $17 Implemented
MI0067 # 03 Y:2003 03 2003 COVER OPEN TANKS $62 $120 Implemented
UU0026 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,573 $0 Implemented
UD0637 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,187 $8,190 Implemented
UD0637 # 02 Y:2002 02 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,149 $3,200 Implemented
UD0637 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,139 $9,000 Implemented
UD0637 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $0 Implemented
UD0637 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $132 $150 Implemented
UD0637 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55 $12 Implemented
MO0180 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $981 $1,097 Implemented
MO0180 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,872 $3,120 Implemented
MO0180 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $0 Implemented
MO0180 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,105 $19,207 Implemented
MO0180 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $1,102 $460 Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
UM0022 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $540 $367 Implemented
UM0022 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,344 $4,614 Implemented