Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 3339 | Primary Nonferrous Metals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | n/a |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | n/a |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | n/a |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | n/a |
MA0827 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,062 | $75,000 | Not Implemented |
MA0827 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,909 | $26,950 | Implemented |
MA0827 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,022 | $11,050 | Not Implemented |
MA0827 # 05 Y:2021 | 05 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,962 | $10,800 | Not Implemented |
MA0827 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $801 | $1,550 | Not Implemented |
MA0827 # 06 Y:2021 | 06 | 2021 | MINIMIZE WATER USAGE | $1,374 | $3,230 | Not Implemented |
MA0827 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,685 | $2,000 | Implemented |
UU0177 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,105 | $11,650 | Implemented |
UU0177 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,132 | $22,614 | Not Implemented |
UU0177 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,515 | $5,046 | Implemented |
UU0177 # 08 Y:2021 | 08 | 2021 | REDUCE VENTILATION AIR | $4,129 | $4,000 | Implemented |
UU0177 # 03 Y:2021 | 03 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $32,792 | $101,000 | Not Implemented |
UU0177 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $36,240 | $6,760 | Implemented |
UU0177 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,455 | $14,250 | Implemented |
UU0177 # 09 Y:2021 | 09 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,497 | $100 | Implemented |
UU0177 # 01 Y:2021 | 01 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,706 | $128,174 | Not Implemented |
UU0177 # 10 Y:2021 | 10 | 2021 | INSTALL OCCUPANCY SENSORS | $1,441 | $1,625 | Not Implemented |
SF0468 # 03 Y:2015 | 03 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,761 | $0 | Implemented |
SF0468 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,358 | $455 | Not Implemented |
SF0468 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,328 | $0 | Not Implemented |
SF0468 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,141 | $1,658 | Implemented |