IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 3339 Primary Nonferrous Metals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0468 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,328 $0 Not Implemented
SF0468 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,506 $8,348 Implemented
OR0644 # 03 Y:2015 03 2015 ELIMINATE/REDUCE AN OPERATION $106,634 $72,750 Implemented
OR0644 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,431 $1,600 Not Implemented
OR0644 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $456,074 $95,650 Not Implemented
OR0644 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $122,402 $38,517 Not Implemented
OR0644 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $3,865 Implemented
OR0644 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $37,274 $20,400 Implemented
UM0435 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $200 Not Implemented
UM0435 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $3,000 Implemented
UM0435 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,450 $4,500 Implemented
UM0435 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $2,500 Implemented
OR0592 # 03 Y:2012 03 2012 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $40,400 $70,000 Implemented
OR0592 # 05 Y:2012 05 2012 ELIMINATE/REDUCE AN OPERATION $2,222 $120 Not Implemented
OR0592 # 04 Y:2012 04 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $15,020 $0 Implemented
OR0592 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,815 $42,303 Not Implemented
OR0592 # 01 Y:2012 01 2012 REDUCE SCRAP PRODUCTION $413,713 $260,000 Not Implemented
OR0592 # 06 Y:2012 06 2012 UPGRADE CONTROLS ON COMPRESSORS $919 $1,805 Not Implemented
UA0062 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,392 $60 Implemented
UA0062 # 03 Y:2011 03 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $225,820 $628,000 Not Implemented
UA0062 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $2,440 Implemented
SF0349 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $0 Implemented
SF0349 # 07 Y:2007 07 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,644 $8,646 Not Implemented
SF0349 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,139 $10,019 Not Implemented
SF0349 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,042 $2,339 Not Implemented