IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 3339 Primary Nonferrous Metals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 12 Y:2007 12 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $904 $2,887 Not Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
UU0026 # 01 Y:2002 01 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,189 $0 Not Implemented
UU0026 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,788 $2,667 Not Implemented
UU0026 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,573 $0 Implemented
UU0026 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $3,197 $3,100 Not Implemented
UU0026 # 05 Y:2002 05 2002 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,389 $2,110 Not Implemented
UU0026 # 06 Y:2002 06 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $260 $1,200 Not Implemented
UU0026 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $1,499 $0 Not Implemented
BD0128 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $16,490 $25,000 Not Implemented
BD0128 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,012 $600 Not Implemented
BD0128 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,032 $0 Not Implemented
BD0128 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,539 $500 Not Implemented
BD0128 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $1,524 $600 Not Implemented
BD0128 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $1,231 $750 Not Implemented
BD0128 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $11,183 $8,000 Not Implemented
BD0128 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $996 $1,705 Not Implemented
BD0128 # 09 Y:1999 09 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,988 $500 Not Implemented
BD0128 # 10 Y:1999 10 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,800 $500 Not Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
OR0251 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $17,025 Not Implemented
OR0251 # 04 Y:1995 04 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $145,120 $1,495,000 Not Implemented
UM0022 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $540 $367 Implemented