IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

355

matching recommendations
Reset
SIC 334 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0378 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68,485 $2,000 Implemented
UM0378 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $2,693 $3,996 Implemented
UM0378 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,599 $1,500 Implemented
UM0378 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,490 $31,638 Implemented
UM0378 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,345 $7,800 Implemented
UM0378 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $1,000 Implemented
UM0378 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $102 $10 Not Implemented
UD0774 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $2,250 Implemented
UD0774 # 03 Y:2008 03 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $83,440 $5,000 Implemented
UD0774 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,656 $6,000 Implemented
UD0774 # 11 Y:2008 11 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,078 $0 Implemented
UD0774 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,237 $0 Not Implemented
UD0774 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,863 $6,540 Not Implemented
UD0774 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,208 $12,758 Not Implemented
UD0774 # 04 Y:2008 04 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,764 $4,008 Not Implemented
UD0774 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,705 $3,275 Implemented
UD0774 # 06 Y:2008 06 2008 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $9,454 $0 Implemented
UD0774 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $118,235 $50,000 Not Implemented
LM0125 # 03 Y:2007 03 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $89,704 $11,000 Implemented
LM0125 # 02 Y:2007 02 2007 INSTALL BACK-UP EQUIPMENT $20,000 $20,000 Not Implemented
LM0125 # 04 Y:2007 04 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,618 $40,000 Not Implemented
LM0125 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,003 $2,604 Implemented
UM0305 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,049 $1,300 Not Implemented
UM0305 # 07 Y:2006 07 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,689 $4,660 Implemented
UM0305 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $75 Implemented