Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 3341 | Secondary Nonferrous Metals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0378 # 07 Y:2010 | 07 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,345 | $7,800 | Implemented |
UM0378 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,599 | $1,500 | Implemented |
UM0378 # 05 Y:2010 | 05 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $68,485 | $2,000 | Implemented |
UM0378 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $102 | $10 | Not Implemented |
UM0378 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $1,000 | Implemented |
UM0378 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $2,693 | $3,996 | Implemented |
UM0378 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,490 | $31,638 | Implemented |
BD0299 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $485 | $143 | Not Implemented |
BD0299 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $225 | $60 | Not Implemented |
BD0299 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM THICKNESS INSULATION | $432 | $210 | Not Implemented |
BD0299 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $482 | $220 | Not Implemented |
BD0299 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $483 | $105 | Not Implemented |
BD0299 # 02 Y:2006 | 02 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $1,386 | $3,200 | Not Implemented |
BD0299 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,732 | $3,640 | Not Implemented |
IC0082 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $158,811 | $0 | Implemented |
IC0082 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $212,513 | $1,533 | Not Implemented |
IC0082 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $295,385 | $90,783 | Implemented |
IC0082 # 04 Y:2004 | 04 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $54,932 | $8,421 | Implemented |
IC0082 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,283 | $1,450 | Implemented |
IC0082 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,495 | $470,000 | Not Implemented |
IC0082 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $311 | $282,150 | Implemented |
IC0082 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $516 | $600,000 | Not Implemented |
BD0106 # 02 Y:1998 | 02 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,383 | $0 | Not Implemented |
BD0106 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $154,560 | $23,000 | Not Implemented |
BD0106 # 07 Y:1998 | 07 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $10,330 | $210 | Not Implemented |