IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

865

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0506 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $563 $1,476 Implemented
LL0337 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $88,374 $59,360 Implemented
LL0337 # 05 Y:2010 05 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $1,650 Implemented
NC0397 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,804 $12,206 Implemented
NC0397 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $399 $100 Implemented
UA0032 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,663 $0 Implemented
UA0032 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,535 $3,000 Implemented
UA0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,243 $220,339 Implemented
UA0032 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $19,240 $2,900 Implemented
UA0032 # 07 Y:2009 07 2009 USE MINIMUM SAFE OVEN VENTILATION $3,687 $4,300 Implemented
SU0275 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,827 $0 Implemented
SU0275 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,818 $800 Implemented
SU0275 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $2,108 $155 Implemented
SU0275 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292,552 $333,015 Implemented
SU0275 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $1,608 Implemented
IA0434 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,207 $217,391 Implemented
IA0434 # 02 Y:2008 02 2008 ADD AREA LIGHTING SWITCHES $4,676 $1,417 Implemented
IA0434 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,439 $616 Implemented
IA0434 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,833 $596 Implemented
IA0434 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,490 $1,059 Implemented
IA0434 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $1,153 $600 Implemented
IA0434 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,060 $15,120 Implemented
IA0434 # 11 Y:2008 11 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,653 $7,425 Implemented
LE0272 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $272 Implemented
LE0271 # 01 Y:2008 01 2008 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $94,198 $45,000 Implemented