Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0705 # 05 Y:2013 | 05 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,939 | $13,700 | Implemented |
MA0705 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,284 | $19,400 | Implemented |
MA0705 # 07 Y:2013 | 07 | 2013 | PAY UTILITY BILLS ON TIME | $1,191 | $500 | Implemented |
MA0705 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,053 | $2,800 | Implemented |
MA0630 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $639 | $300 | Implemented |
MA0630 # 03 Y:2008 | 03 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,565 | $2,000 | Implemented |
MA0630 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $189 | $1,300 | Implemented |
MA0574 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,466 | $1,801 | Implemented |
MA0574 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $179,823 | $140,865 | Implemented |
MA0574 # 02 Y:2005 | 02 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140,952 | $230,000 | Implemented |
MA0574 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,911 | $5,770 | Implemented |
MA0574 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $960 | $0 | Implemented |
MA0322 # 08 Y:1995 | 08 | 1995 | USE OTHER WASTE CONCENTRATION METHODS | $61,150 | $85,000 | Implemented |
MA0322 # 02 Y:1995 | 02 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,120 | $1,500 | Implemented |
MA0322 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,158 | $2,200 | Implemented |
MA0322 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,082 | $17,946 | Implemented |
MA0322 # 07 Y:1995 | 07 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $384 | $945 | Implemented |
MA0214 # 05 Y:1991 | 05 | 1991 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $5,456 | $5,690 | Implemented |
MA0214 # 04 Y:1991 | 04 | 1991 | BURN A LESS EXPENSIVE GRADE OF FUEL | $5,411 | $0 | Implemented |
MA0214 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $482 | Implemented |
MA0214 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $346 | $652 | Implemented |
MA0214 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $588 | $108 | Implemented |
MA0198 # 04 Y:1990 | 04 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,450 | $102,564 | Implemented |
MA0086 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,778 | $47,000 | Implemented |
MA0081 # 04 Y:1987 | 04 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,453 | $6,000 | Implemented |