Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0454 # 03 Y:2015 | 03 | 2015 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,130 | $1,710 | Implemented |
UD0766 # 14 Y:2007 | 14 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,115 | $0 | Implemented |
UD0766 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,564 | $19,275 | Implemented |
UD0766 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,343 | $85,140 | Implemented |
UD0766 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,800 | $20,000 | Implemented |
UD0766 # 07 Y:2007 | 07 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $40,000 | $1,100 | Implemented |
UD0766 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,420 | $279,770 | Implemented |
WV0318 # 10 Y:2005 | 10 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,532 | $5,220 | Implemented |
WV0318 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,258 | $360 | Implemented |
WV0318 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $39,332 | $8,388 | Implemented |
WV0318 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,012 | $3,064 | Implemented |
WV0318 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $4,198 | $330 | Implemented |
WV0318 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,845 | $6,470 | Implemented |
WV0318 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $587 | Implemented |
WV0318 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,757 | $620 | Implemented |
WV0288 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,932 | $50 | Implemented |
WV0288 # 07 Y:2004 | 07 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $4,573 | $1,000 | Implemented |
WV0288 # 06 Y:2004 | 06 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $5,772 | $27,600 | Implemented |
WV0288 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,212 | $1,200 | Implemented |
WV0288 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,141 | $360 | Implemented |
WV0288 # 10 Y:2004 | 10 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,739 | $575 | Implemented |
WV0288 # 13 Y:2004 | 13 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $203 | $25 | Implemented |
WV0288 # 14 Y:2004 | 14 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95 | $200 | Implemented |
UM0200 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,418 | $2,000 | Implemented |
UM0200 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,869 | $750 | Implemented |