IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0261 # 07 Y:2021 07 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,374 $0 Implemented
TT0261 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $26,082 $700 Implemented
TT0261 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,358 $3,200 Implemented
TT0261 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $188,912 $733,702 Implemented
TT0159 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $2,995 $1,070 Implemented
TT0159 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,187 $500 Implemented
TT0159 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,644 $3,000 Implemented
TT0095 # 01 Y:2012 01 2012 REPLACE BOILER $8,685 $5,000 Implemented
TT0095 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $1,770 $1,195 Implemented
TT0095 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,668 $7,000 Implemented
TT0095 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,751 $33,080 Implemented
TT0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $62,060 $50,000 Implemented
TT0005 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $47,304 $2,000 Implemented
TT0005 # 05 Y:2007 05 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,002 $200 Implemented
TT0005 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $4,816 Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented