IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0338 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,301 $19,680 Not Implemented
UM0338 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $16,908 $4,000 Not Implemented
UM0338 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $30,146 $38,350 Not Implemented
UM0338 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,305 $4,480 Not Implemented
UM0338 # 07 Y:2008 07 2008 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $257 $1,095 Not Implemented
UM0338 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $103 $270 Not Implemented
UM0227 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $1,725 Implemented
UM0227 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,930 $1,000 Not Implemented
UM0227 # 03 Y:2003 03 2003 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $5,893 $10,000 Not Implemented
UM0227 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,016 $1,920 Not Implemented
UM0227 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,702 $19,995 Not Implemented
UM0227 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,800 $1,000 Not Implemented
UM0227 # 07 Y:2003 07 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,640 $1,300 Implemented
UM0227 # 08 Y:2003 08 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $303 $700 Not Implemented
UM0163 # 08 Y:2000 08 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,512 $60,000 Not Implemented
UM0163 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,712 $84,426 Not Implemented
UM0163 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,248 $0 Implemented
UM0163 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,496 $500 Implemented
UM0163 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,147 $300 Implemented
UM0163 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,922 $1,500 Not Implemented
UM0163 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $2,100 $200 Not Implemented
UM0163 # 07 Y:2000 07 2000 INSULATE BARE EQUIPMENT $10,078 $10,000 Not Implemented
UM0163 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,997 $90,000 Implemented
UM0127 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,705 $13,600 Not Implemented
UM0127 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $30,552 $35,000 Not Implemented