IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0032 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,487 $162 Not Implemented
UA0032 # 05 Y:2009 05 2009 INSTALL TIMERS AND/OR THERMOSTATS $4,594 $680 Not Implemented
UA0032 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $19,240 $2,900 Implemented
UA0032 # 07 Y:2009 07 2009 USE MINIMUM SAFE OVEN VENTILATION $3,687 $4,300 Implemented
SU0275 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,827 $0 Implemented
SU0275 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,818 $800 Implemented
SU0275 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $2,108 $155 Implemented
SU0275 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,109 $11,160 Not Implemented
SU0275 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $2,884 $833 Not Implemented
SU0275 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292,552 $333,015 Implemented
SU0275 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $1,608 Implemented
OR0539 # 01 Y:2008 01 2008 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $218,543 $1,128,211 Not Implemented
OR0539 # 02 Y:2008 02 2008 USE EXISTING DAM TO GENERATE ELECTRICITY $31,589 $50,000 Not Implemented
OR0539 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $5,432 $23,075 Not Implemented
OR0539 # 04 Y:2008 04 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $106,649 $758,330 Not Implemented
OR0539 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,317 $72,600 Not Implemented
OR0539 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $4,450 $19,950 Not Implemented
OR0539 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,860 $0 Not Implemented
OR0539 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Not Implemented
OR0539 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Not Implemented
OR0539 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,200 $43,600 Not Implemented
OR0539 # 11 Y:2008 11 2008 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $52,540 $2,200 Not Implemented
OR0539 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Not Implemented
OR0539 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Not Implemented
IA0434 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,207 $217,391 Implemented