IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0371 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $100 Implemented
NC0371 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,277 $17,280 Implemented
NC0371 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,923 $4,350 Not Implemented
NC0371 # 05 Y:2008 05 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,415 $2,000 Not Implemented
NC0371 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,037 $2,000 Not Implemented
NC0371 # 07 Y:2008 07 2008 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,143 $10,000 Not Implemented
NC0371 # 08 Y:2008 08 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $998 $0 Not Implemented
NC0371 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $288 $485 Implemented
NC0371 # 10 Y:2008 10 2008 ADOPT IN-HOUSE MATERIAL GENERATION $28,534 $85,000 Not Implemented
NC0371 # 11 Y:2008 11 2008 DEVELOP A REPAIR/REPLACE POLICY $5,688 $13,149 Not Implemented
NC0309 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $89,630 $5,000 Implemented
NC0309 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,148 $21,000 Implemented
NC0309 # 03 Y:2005 03 2005 MAKE A NEW BY-PRODUCT $15,600 $1,000 Not Implemented
NC0309 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,268 $6,500 Implemented
NC0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,767 $100 Implemented
NC0251 # 01 Y:2002 01 2002 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $29,079 $130,000 Not Implemented
NC0251 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $50,797 $100,000 Not Implemented
NC0251 # 03 Y:2002 03 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,593 $7,000 Not Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented
NC0139 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,306 $18,000 Not Implemented
NC0139 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,424 $1,800 Implemented
NC0139 # 03 Y:1998 03 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,875 $2,500 Not Implemented
NC0139 # 04 Y:1998 04 1998 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,815 $25,000 Not Implemented