IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0520 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,371 $500 Not Implemented
WI0520 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,283 $0 Implemented
WI0520 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,055 $1,845 Not Implemented
WI0520 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $135 $350 Implemented
LL0254 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $19,091 $3,880 Implemented
LL0254 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $18,943 $4,090 Implemented
LL0254 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,345 $2,565 Not Implemented
LL0254 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $5,323 $1,185 Not Implemented
LL0254 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,656 $1,920 Not Implemented
LL0254 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $867 $555 Not Implemented
LL0254 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $94 $102 Not Implemented
UU0102 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $88,420 $3,500 Implemented
UU0102 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $4,040 Implemented
UU0102 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $620 Not Implemented
UU0102 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $23,250 $8,290 Implemented
UU0102 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,990 $78,390 Not Implemented
MS0294 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $93,222 $290,000 Not Implemented
MS0294 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,448 $70,420 Not Implemented
MS0294 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,175 $21,180 Not Implemented
MS0294 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $10,811 Not Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
SU0226 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,304 $0 n/a
SU0226 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,426 $0 n/a