IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0139 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,277 $70,000 Not Implemented
NC0139 # 06 Y:1998 06 1998 USE OTHER WASTE CONCENTRATION METHODS $4,704 $4,000 Not Implemented
NC0139 # 07 Y:1998 07 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $418,000 $750,000 Not Implemented
NC0132 # 01 Y:1998 01 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,465 $14,500 Not Implemented
NC0132 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,949 $11,150 Not Implemented
NC0132 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,486 $2,688 Not Implemented
NC0132 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $2,506 $2,940 Not Implemented
NC0132 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,455 $1,600 Not Implemented
NC0132 # 06 Y:1998 06 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $440 $1,333 Not Implemented
NC0132 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,816 $13,801 Not Implemented
NC0132 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $900 $200 Not Implemented
NC0132 # 09 Y:1998 09 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $119,000 $500 Not Implemented
NC0078 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,648 $6,993 Implemented
NC0078 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,528 $1,530 Not Implemented
NC0078 # 03 Y:1996 03 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $14,370 $7,500 Implemented
NC0078 # 04 Y:1996 04 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,344 $0 Implemented
NC0078 # 05 Y:1996 05 1996 IMPROVE LUBRICATION PRACTICES $9,017 $20,000 Implemented
NC0078 # 06 Y:1996 06 1996 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $7,134 $25,000 Not Implemented
NC0045 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,193 $5,730 Not Implemented
NC0045 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,703 $2,581 Not Implemented
NC0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,943 $630 Implemented
NC0045 # 04 Y:1994 04 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,312 $720 Not Implemented
NC0045 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $2,490 $210 Not Implemented
NC0045 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $500 Implemented
NC0045 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $29,276 $4,511 Implemented