IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0314 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $30 Implemented
AS0314 # 05 Y:2001 05 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $283 $766 Not Implemented
AS0314 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $142 $50 Implemented
AS0314 # 07 Y:2001 07 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,340 $1,262 Implemented
AS0314 # 08 Y:2001 08 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,055 $40 Implemented
AS0314 # 09 Y:2001 09 2001 CLEAR AND RENT EXISTING SPACE $38,822 $4,156 Implemented
AS0314 # 10 Y:2001 10 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $74,880 $1,732 Not Implemented
UM0201 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $972,000 $3,390,000 n/a
UM0201 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $493,600 $1,060,000 n/a
UM0201 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $519,147 $1,100,000 Not Implemented
UM0201 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $76,800 $348,000 Not Implemented
UM0200 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $496,000 $1,557,500 Not Implemented
UM0200 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,300 $5,000 Not Implemented
UM0200 # 03 Y:2002 03 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $88,500 $38,500 Not Implemented
UM0200 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $18,500 $16,000 Not Implemented
UM0200 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,418 $2,000 Implemented
UM0200 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,869 $750 Implemented
OK0616 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $447 $2,790 Not Implemented
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 04 Y:2001 04 2001 INSTALL COMMON HEADER ON COMPRESSORS $11,108 $7,010 Not Implemented
OK0616 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,001 $25,778 n/a
OK0616 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $21,884 Not Implemented
OK0616 # 07 Y:2001 07 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,930,557 $208,000 n/a
OK0616 # 08 Y:2001 08 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,739 $3,900 Not Implemented