Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,036
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0206 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $139,892 | $110,800 | Implemented |
UU0206 # 02 Y:2022 | 02 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $79,430 | $1,500 | Implemented |
UU0206 # 03 Y:2022 | 03 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $15,730 | $3,713 | Implemented |
UU0206 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $23,515 | $750 | Implemented |
UU0206 # 05 Y:2022 | 05 | 2022 | MINIMIZE WATER USAGE | $5,292 | $1,764 | Implemented |
UU0206 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,388 | $5,440 | Not Implemented |
UU0206 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,019 | Implemented |
UU0206 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,802 | $1,125 | Not Implemented |
UU0206 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $983 | $375 | Not Implemented |
SF0586 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,887 | $0 | Implemented |
SF0586 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,868 | $0 | Implemented |
SF0586 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,078 | $22,361 | Implemented |
SF0586 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,428 | $26,487 | Implemented |
SF0586 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,916 | $68,135 | Implemented |
SF0586 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,974 | $4,260 | Implemented |
SF0586 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,736 | $14,830 | Implemented |
SF0586 # 08 Y:2022 | 08 | 2022 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $62,090 | $317,631 | Implemented |
MS0394 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,140 | $111,625 | Not Implemented |
MS0394 # 02 Y:2022 | 02 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $22,395 | $11,275 | Not Implemented |
MS0394 # 03 Y:2022 | 03 | 2022 | REPLACE BOILER | $28,522 | $145,930 | Not Implemented |
IC0259 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,393 | $953 | Not Implemented |
IC0259 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,107 | $15,295 | Not Implemented |
IC0259 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,350 | $730 | Not Implemented |
IC0259 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $50 | Not Implemented |
UU0196 # 01 Y:2022 | 01 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $10,923 | $250 | Implemented |