IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0674 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $12,618 $0 Not Implemented
GT0674 # 11 Y:1999 11 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $306,000 $215,000 Not Implemented
GT0674 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $45,500 $60,000 Not Implemented
GT0674 # 02 Y:1999 02 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,592 $0 Not Implemented
GT0674 # 03 Y:1999 03 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,037 $400 Implemented
HO0211 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,520 $15,297 Implemented
HO0211 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $9,233 Implemented
HO0211 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $1,500 Implemented
HO0211 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $20 Implemented
HO0211 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $2,000 Implemented
HO0211 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $200 Implemented
HO0211 # 07 Y:1999 07 1999 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $969 $1,400 Not Implemented
HO0211 # 08 Y:1999 08 1999 USE COMPRESSOR AIR FILTERS $6,130 $150 Implemented
HO0211 # 09 Y:1999 09 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,690 $1,400 Not Implemented
HO0211 # 10 Y:1999 10 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $15,600 $480 Implemented
UL0227 # 01 Y:1999 01 1999 RECOVER AND REUSE WASTE MATERIAL $43,200 $5,000 Not Implemented
UL0227 # 02 Y:1999 02 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $48,094 $8,165 Not Implemented
UL0227 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $10,644 $0 Not Implemented
UL0227 # 04 Y:1999 04 1999 MODIFY STARTUP/SHUTDOWN TIMES $318,710 $533,131 Not Implemented
UL0227 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,430 $1,799 Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $91,400 $49,760 Not Implemented
TN0661 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $73,031 $8,750 Not Implemented
TN0661 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $72,160 $93,000 Not Implemented
TN0661 # 05 Y:1999 05 1999 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $39,290 $2,720 Not Implemented