Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,036
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0120 # 06 Y:1998 | 06 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,664 | $270 | Implemented |
MS0120 # 07 Y:1998 | 07 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,987 | $1,424 | Implemented |
MS0120 # 08 Y:1998 | 08 | 1998 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $15,436 | $142,800 | Not Implemented |
MS0120 # 09 Y:1998 | 09 | 1998 | OPERATE BOILERS ON HIGH FIRE SETTING | $37,680 | $0 | Not Implemented |
MS0120 # 10 Y:1998 | 10 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $171 | $82 | Not Implemented |
MS0120 # 11 Y:1998 | 11 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,658 | $0 | Implemented |
MS0120 # 12 Y:1998 | 12 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $-400 | $0 | Implemented |
MS0120 # 13 Y:1998 | 13 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,881 | $17,414 | Implemented |
MO0245 # 01 Y:1998 | 01 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $21,816 | $9,450 | Not Implemented |
MO0245 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,742 | $77 | Implemented |
MO0245 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,685 | $40 | Not Implemented |
MO0245 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,238 | $33,352 | Implemented |
MO0245 # 05 Y:1998 | 05 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $23,640 | $0 | Implemented |
MO0245 # 06 Y:1998 | 06 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $910 | $1,000 | Not Implemented |
AS0229 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,509 | $12,941 | Not Implemented |
AS0229 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,979 | $200 | Implemented |
AS0229 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,030 | $56,554 | Implemented |
AS0229 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $352 | $435 | Implemented |
AS0229 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,538 | $16,808 | Not Implemented |
AS0229 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,691 | $300 | Not Implemented |
AS0229 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,284 | $6,800 | Not Implemented |
AS0229 # 08 Y:1998 | 08 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $1,094 | $1,275 | Not Implemented |
AS0229 # 09 Y:1998 | 09 | 1998 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,718 | $450 | Implemented |
AS0229 # 10 Y:1998 | 10 | 1998 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $859 | $150 | Implemented |
AS0229 # 11 Y:1998 | 11 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,584 | $60 | Not Implemented |