IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0132 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,816 $13,801 Not Implemented
NC0132 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $900 $200 Not Implemented
NC0132 # 09 Y:1998 09 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $119,000 $500 Not Implemented
UL0183 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $2,200 Implemented
UL0183 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $151 $2,700 Not Implemented
UL0183 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,200 $260 Not Implemented
UL0183 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,650 $40 Not Implemented
UL0183 # 05 Y:1997 05 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $40,200 $82,600 Not Implemented
UL0183 # 06 Y:1997 06 1997 CLEAR AND RENT EXISTING SPACE $130,000 $2,400 Implemented
TN0606 # 01 Y:1997 01 1997 REVISE RAW MATERIAL SPECS $134,780 $10,600 Implemented
TN0606 # 02 Y:1997 02 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $19,980 $8,480 Implemented
TN0606 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,900 $3,800 Implemented
TN0606 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,800 $0 Implemented
TN0606 # 05 Y:1997 05 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,600 $0 Implemented
TN0606 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,320 $2,800 Not Implemented
TN0606 # 07 Y:1997 07 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,000 $375 Not Implemented
TN0606 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $400 Not Implemented
OK0517 # 01 Y:1997 01 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $124,800 $150,000 Implemented
OK0517 # 02 Y:1997 02 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,653 $36,725 Implemented
OK0517 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,810 $5,000 Not Implemented
OK0517 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $434 $1,872 Implemented
OK0517 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45 $40 Implemented
SD0162 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,580 $53,210 Implemented
SD0162 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $242,027 $70,000 Not Implemented
SD0162 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $198,103 $70,000 Not Implemented