Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0705 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,284 | $19,400 | Implemented |
MA0705 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,053 | $2,800 | Implemented |
MA0705 # 07 Y:2013 | 07 | 2013 | PAY UTILITY BILLS ON TIME | $1,191 | $500 | Implemented |
MA0705 # 05 Y:2013 | 05 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,939 | $13,700 | Implemented |
MA0630 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $639 | $300 | Implemented |
MA0630 # 03 Y:2008 | 03 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,565 | $2,000 | Implemented |
MA0630 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $189 | $1,300 | Implemented |
MA0574 # 02 Y:2005 | 02 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140,952 | $230,000 | Implemented |
MA0574 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,466 | $1,801 | Implemented |
MA0574 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,911 | $5,770 | Implemented |
MA0574 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $960 | $0 | Implemented |
MA0574 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $179,823 | $140,865 | Implemented |
MA0322 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,158 | $2,200 | Implemented |
MA0322 # 02 Y:1995 | 02 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,120 | $1,500 | Implemented |
MA0322 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,082 | $17,946 | Implemented |
MA0322 # 07 Y:1995 | 07 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $384 | $945 | Implemented |
MA0322 # 08 Y:1995 | 08 | 1995 | USE OTHER WASTE CONCENTRATION METHODS | $61,150 | $85,000 | Implemented |
MA0214 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $588 | $108 | Implemented |
MA0214 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $346 | $652 | Implemented |
MA0214 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $482 | Implemented |
MA0214 # 04 Y:1991 | 04 | 1991 | BURN A LESS EXPENSIVE GRADE OF FUEL | $5,411 | $0 | Implemented |
MA0214 # 05 Y:1991 | 05 | 1991 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $5,456 | $5,690 | Implemented |
MA0198 # 04 Y:1990 | 04 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,450 | $102,564 | Implemented |
MA0086 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,778 | $47,000 | Implemented |
MA0081 # 02 Y:1987 | 02 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $810 | $1,400 | Implemented |