Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0207 # 05 Y:1998 | 05 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $306,800 | $117,500 | Implemented |
UL0207 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $20 | Implemented |
UL0207 # 04 Y:1998 | 04 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $6,000 | $1,320 | Not Implemented |
UL0207 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $74,500 | $163,800 | Not Implemented |
UL0207 # 01 Y:1998 | 01 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,709 | $120 | Implemented |
MS0120 # 05 Y:1998 | 05 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,417 | $1,000 | Implemented |
MS0120 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,885 | $881 | Implemented |
MS0120 # 11 Y:1998 | 11 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,658 | $0 | Implemented |
MS0120 # 10 Y:1998 | 10 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $171 | $82 | Not Implemented |
MS0120 # 06 Y:1998 | 06 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,664 | $270 | Implemented |
MS0120 # 09 Y:1998 | 09 | 1998 | OPERATE BOILERS ON HIGH FIRE SETTING | $37,680 | $0 | Not Implemented |
MS0120 # 04 Y:1998 | 04 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,888 | $6,000 | Not Implemented |
MS0120 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,002 | $5,805 | Not Implemented |
MS0120 # 02 Y:1998 | 02 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,972 | $5,703 | Implemented |
MS0120 # 12 Y:1998 | 12 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $-400 | $0 | Implemented |
MS0120 # 08 Y:1998 | 08 | 1998 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $15,436 | $142,800 | Not Implemented |
MS0120 # 07 Y:1998 | 07 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,987 | $1,424 | Implemented |
MS0120 # 13 Y:1998 | 13 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,881 | $17,414 | Implemented |
MO0245 # 05 Y:1998 | 05 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $23,640 | $0 | Implemented |
MO0245 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,742 | $77 | Implemented |
MO0245 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,685 | $40 | Not Implemented |
MO0245 # 01 Y:1998 | 01 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $21,816 | $9,450 | Not Implemented |
MO0245 # 06 Y:1998 | 06 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $910 | $1,000 | Not Implemented |
MO0245 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,238 | $33,352 | Implemented |
AS0229 # 09 Y:1998 | 09 | 1998 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,718 | $450 | Implemented |