Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsSIC | 3351 | Copper Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0834 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,900 | $900 | Not Implemented |
OK0834 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,600 | $18,285 | Not Implemented |
OK0834 # 01 Y:2012 | 01 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,800 | $0 | Implemented |
SU0315 # 08 Y:2012 | 08 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $82 | $436 | Not Implemented |
SU0315 # 07 Y:2012 | 07 | 2012 | OPTIMIZE PLANT POWER FACTOR | $8,366 | $42,403 | Not Implemented |
SU0315 # 06 Y:2012 | 06 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $33,502 | $167,290 | Not Implemented |
SU0315 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $149 | $652 | Not Implemented |
SU0315 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $317 | $140 | Not Implemented |
SU0315 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,269 | $1,357 | Not Implemented |
SU0315 # 02 Y:2012 | 02 | 2012 | RECOVER AND REUSE SPENT ACID BATHS | $28,847 | $792 | Not Implemented |
SU0315 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,327 | $0 | Not Implemented |
NC0358 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $308 | $100 | Implemented |
NC0358 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $6,682 | $13,000 | Not Implemented |
NC0358 # 02 Y:2007 | 02 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,860 | $2,751 | Not Implemented |
NC0358 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,543 | $24,660 | Not Implemented |
NC0358 # 06 Y:2007 | 06 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $767 | $1,000 | Not Implemented |
NC0358 # 07 Y:2007 | 07 | 2007 | USE PHOTOCELL CONTROLS | $187 | $200 | Not Implemented |
NC0358 # 08 Y:2007 | 08 | 2007 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $805,000 | $56,000 | Not Implemented |
NC0358 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $327 | $316 | Implemented |
MS0294 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $93,222 | $290,000 | Not Implemented |
MS0294 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,448 | $70,420 | Not Implemented |
MS0294 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,175 | $21,180 | Not Implemented |
MS0294 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,047 | $10,811 | Not Implemented |
MS0294 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $172 | Implemented |
MS0294 # 07 Y:2006 | 07 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $381 | $240 | Not Implemented |