IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0476 # 03 Y:2000 03 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,310 $1,000 Implemented
CO0476 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $62,600 $18,400 Implemented
CO0476 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $16,290 $13,500 Not Implemented
CO0476 # 06 Y:2000 06 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,490 $41,000 Not Implemented
NC0139 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,306 $18,000 Not Implemented
NC0139 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,424 $1,800 Implemented
NC0139 # 03 Y:1998 03 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,875 $2,500 Not Implemented
NC0139 # 04 Y:1998 04 1998 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,815 $25,000 Not Implemented
NC0139 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,277 $70,000 Not Implemented
NC0139 # 06 Y:1998 06 1998 USE OTHER WASTE CONCENTRATION METHODS $4,704 $4,000 Not Implemented
NC0139 # 07 Y:1998 07 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $418,000 $750,000 Not Implemented
UL0183 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $2,200 Implemented
UL0183 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $151 $2,700 Not Implemented
UL0183 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,200 $260 Not Implemented
UL0183 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,650 $40 Not Implemented
UL0183 # 05 Y:1997 05 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $40,200 $82,600 Not Implemented
UL0183 # 06 Y:1997 06 1997 CLEAR AND RENT EXISTING SPACE $130,000 $2,400 Implemented
AR0099 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,044 $1,143 Implemented
AR0099 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,354 $2,920 Implemented
AR0099 # 03 Y:1996 03 1996 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $13,886 $13,040 Implemented
AR0099 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,537 $200 Implemented
AR0099 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,300 $0 Not Implemented
AR0099 # 06 Y:1996 06 1996 MAINTAIN MACHINES TO REDUCE LEAKS $7,300 $600 Implemented
OK0437 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,582 $0 Implemented
OK0437 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,255 $5,951 Not Implemented