Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
768
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0314 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,375 | $112 | Implemented |
AS0314 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $30 | Implemented |
AS0314 # 05 Y:2001 | 05 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $283 | $766 | Not Implemented |
AS0314 # 06 Y:2001 | 06 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $142 | $50 | Implemented |
AS0314 # 07 Y:2001 | 07 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,340 | $1,262 | Implemented |
AS0314 # 08 Y:2001 | 08 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,055 | $40 | Implemented |
AS0314 # 09 Y:2001 | 09 | 2001 | CLEAR AND RENT EXISTING SPACE | $38,822 | $4,156 | Implemented |
AS0314 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $74,880 | $1,732 | Not Implemented |
UU0010 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,308 | $9,973 | Implemented |
UU0010 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,643 | $75 | Implemented |
UU0010 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,495 | $680 | Implemented |
UU0010 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,361 | $2,792 | Not Implemented |
UU0010 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $761 | $600 | Implemented |
WV0226 # 01 Y:2001 | 01 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,373 | $0 | Implemented |
WV0226 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,673 | $1,100 | Implemented |
WV0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $4,794 | $1,008 | Implemented |
WV0226 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $2,882 | $336 | Implemented |
WV0226 # 05 Y:2001 | 05 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,676 | $7,960 | Not Implemented |
WV0226 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,563 | $280 | Not Implemented |
WV0226 # 07 Y:2001 | 07 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,005 | $1,000 | Not Implemented |
WV0226 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,542 | $100 | Implemented |
WV0226 # 09 Y:2001 | 09 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,535 | $6,000 | Not Implemented |
WV0226 # 10 Y:2001 | 10 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,863 | $1,200 | Implemented |
WV0226 # 11 Y:2001 | 11 | 2001 | RECYCLE CLEANING SOLVENT AND REUSE | $43,200 | $36,000 | Not Implemented |
WV0226 # 12 Y:2001 | 12 | 2001 | ADVERTISE PRODUCT OR SERVICE | $312,500 | $2,000 | Implemented |