IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3354 Aluminum Extruded Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0572 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $200 Implemented
NC0572 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $2,418 $5,865 Not Implemented
NC0572 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $21,764 Implemented
NC0572 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,293 $35,726 Implemented
NC0572 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $2,850 $150 Not Implemented
NC0572 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $12,240 Not Implemented
NC0572 # 07 Y:2016 07 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,387 $100 Not Implemented
NC0572 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $307 $571 Not Implemented
NC0572 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $117 $180 Not Implemented
NC0572 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $672 $103 Not Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 01 Y:2002 01 2002 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $29,079 $130,000 Not Implemented
NC0251 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $50,797 $100,000 Not Implemented
NC0251 # 03 Y:2002 03 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,593 $7,000 Not Implemented
NC0045 # 08 Y:1994 08 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $3,000 Implemented
NC0045 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $29,276 $4,511 Implemented
NC0045 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $500 Implemented
NC0045 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $2,490 $210 Not Implemented
NC0045 # 04 Y:1994 04 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,312 $720 Not Implemented
NC0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,943 $630 Implemented
NC0045 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,703 $2,581 Not Implemented
NC0045 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,193 $5,730 Not Implemented
AT0039 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,108 $14,000 Implemented