IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 3355 Aluminum Rolling And Drawing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0504 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,984 $500 Implemented
WV0504 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,624 $12 Implemented
WV0504 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,334 $486 Implemented
WV0504 # 07 Y:2015 07 2015 INSTALL SET-BACK TIMERS $1,890 $1,060 Not Implemented
WV0504 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $1,537 $556 Implemented
WV0504 # 09 Y:2015 09 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,530 $1,000 Not Implemented
WV0504 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $293 $69 Implemented
UM0454 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,000 Not Implemented
UM0454 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,291 $14,700 Not Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented
UM0454 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,892 $4,500 Not Implemented
UM0454 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,354 $1,000 Not Implemented
DL0044 # 01 Y:2009 01 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $89,460 $41,150 Not Implemented
DL0044 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $31,002 $5,550 Not Implemented
DL0044 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $21,300 $575 Not Implemented
DL0044 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,400 $950 Not Implemented
DL0044 # 05 Y:2009 05 2009 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,452 $0 Not Implemented
DL0044 # 06 Y:2009 06 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $37,189 $70,000 Not Implemented
UA0032 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,663 $0 Implemented
UA0032 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,535 $3,000 Implemented
UA0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,243 $220,339 Implemented
UA0032 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,487 $162 Not Implemented
UA0032 # 05 Y:2009 05 2009 INSTALL TIMERS AND/OR THERMOSTATS $4,594 $680 Not Implemented
UA0032 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $19,240 $2,900 Implemented
UA0032 # 07 Y:2009 07 2009 USE MINIMUM SAFE OVEN VENTILATION $3,687 $4,300 Implemented