Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,079
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0467 # 08 Y:2019 | 08 | 2019 | UPGRADE OBSOLETE EQUIPMENT | $500 | $5,000 | Implemented |
LE0467 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,568 | $30,054 | Implemented |
LE0467 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,990 | $2,000 | Implemented |
LE0467 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $825 | $70 | Implemented |
AS0457 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,174 | $0 | Implemented |
AS0457 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,832 | $676 | Implemented |
MZ0254 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,370 | $57,615 | Implemented |
MZ0254 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $384 | $1,000 | Implemented |
MZ0254 # 05 Y:2018 | 05 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,499 | $52,000 | Implemented |
MZ0254 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,856 | $10,840 | Implemented |
MZ0254 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,434 | $10,000 | Implemented |
MZ0254 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM THICKNESS INSULATION | $49,702 | $20,960 | Implemented |
MZ0254 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $180 | Implemented |
UA0193 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,216 | $1,912 | Implemented |
UA0193 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,960 | $1,000 | Implemented |
UD0979 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,640 | $0 | Implemented |
UD0979 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,299 | $1,000 | Implemented |
UD0979 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,331 | $6 | Implemented |
UD0979 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,206 | $905 | Implemented |
UD0979 # 08 Y:2018 | 08 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,917 | $12,782 | Implemented |
UD0979 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM THICKNESS INSULATION | $18,548 | $984 | Implemented |
UD0979 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,834 | $68,160 | Implemented |
UD0979 # 11 Y:2018 | 11 | 2018 | ADD AREA LIGHTING SWITCHES | $1,666 | $130 | Implemented |
IP0096 # 11 Y:2018 | 11 | 2018 | ADD AREA LIGHTING SWITCHES | $1,738 | $130 | Implemented |
IP0096 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,834 | $68,658 | Implemented |