IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0070 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,997 $300 Implemented
AR0070 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,086 $1,000 Implemented
AR0070 # 08 Y:1995 08 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,267 $0 Implemented
AR0070 # 09 Y:1995 09 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $100,584 $0 Implemented
AR0070 # 11 Y:1995 11 1995 MINIMIZE WATER USAGE $840 $200 Implemented
AR0070 # 12 Y:1995 12 1995 MODIFY MATERIAL APPLICATION METHODS $300,000 $3,000 Implemented
OR0246 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,521 $6,281 Implemented
OR0246 # 03 Y:1995 03 1995 MINIMIZE WATER USAGE $3,070 $0 Implemented
OR0246 # 04 Y:1995 04 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $122,760 $205,000 Implemented
OR0246 # 05 Y:1995 05 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,530 $6,500 Implemented
IA0129 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $28,568 $4,200 Implemented
IA0129 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $961 $54 Implemented
IA0129 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $25 Implemented
IA0129 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $720 $317 Implemented
IA0129 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $899 $80 Implemented
WV0073 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,063 $1,113 Implemented
WV0073 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,102 $11,650 Implemented
WV0073 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $952 $200 Implemented
WV0073 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $11,972 $1,278 Implemented
WV0073 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,977 $5,000 Implemented
IA0120 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,990 $135 Implemented
IA0120 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $959 $700 Implemented
IA0120 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $5,311 $115 Implemented
MS0033 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $16,206 $7,500 Implemented
MS0033 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,336 $2,170 Implemented