IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0948 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,945 $360,069 Implemented
UD0948 # 07 Y:2016 07 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,094 $0 Implemented
UD0948 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,398 $0 Implemented
UD0948 # 06 Y:2016 06 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $87,713 $52,000 Implemented
UD0916 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,978 $1,000 Implemented
UD0916 # 10 Y:2014 10 2014 UPGRADE CONTROLS ON COMPRESSORS $10,562 $110,000 Implemented
UD0916 # 12 Y:2014 12 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,800 $0 Implemented
UD0916 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $503 $500 Implemented
UD0761 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $1,325 Implemented
UD0761 # 13 Y:2007 13 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $357 $0 Implemented
UD0761 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,368 $0 Implemented
UD0761 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,582 $2,000 Implemented
UD0761 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,025 $0 Implemented
UD0761 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,895 $660 Implemented
UD0761 # 02 Y:2007 02 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $26,967 $130,000 Implemented
UD0761 # 01 Y:2007 01 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $56,539 $15,760 Implemented
UD0761 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $15,090 $93,600 Implemented
UD0761 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,079 $11,000 Implemented
UD0761 # 12 Y:2007 12 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $898 $1,600 Implemented
WV0349 # 02 Y:2006 02 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $48,286 $39,350 Implemented
WV0349 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,291 $1,000 Implemented
WV0349 # 12 Y:2006 12 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $375 $200 Implemented
WV0349 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $14,527 $640 Implemented
WV0349 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,242 $400 Implemented
WV0349 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $3,740 $1,318 Implemented