Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0948 # 06 Y:2016 | 06 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $87,713 | $52,000 | Implemented |
UD0948 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,945 | $360,069 | Implemented |
UD0948 # 07 Y:2016 | 07 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $38,094 | $0 | Implemented |
UD0948 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,398 | $0 | Implemented |
UD0916 # 12 Y:2014 | 12 | 2014 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,800 | $0 | Implemented |
UD0916 # 10 Y:2014 | 10 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,562 | $110,000 | Implemented |
UD0916 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,978 | $1,000 | Implemented |
UD0916 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $503 | $500 | Implemented |
UD0761 # 09 Y:2007 | 09 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,368 | $0 | Implemented |
UD0761 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,079 | $11,000 | Implemented |
UD0761 # 04 Y:2007 | 04 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $15,090 | $93,600 | Implemented |
UD0761 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,895 | $660 | Implemented |
UD0761 # 02 Y:2007 | 02 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $26,967 | $130,000 | Implemented |
UD0761 # 01 Y:2007 | 01 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $56,539 | $15,760 | Implemented |
UD0761 # 08 Y:2007 | 08 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,582 | $2,000 | Implemented |
UD0761 # 13 Y:2007 | 13 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $357 | $0 | Implemented |
UD0761 # 11 Y:2007 | 11 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,025 | $0 | Implemented |
UD0761 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $1,325 | Implemented |
UD0761 # 12 Y:2007 | 12 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $898 | $1,600 | Implemented |
WV0349 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,242 | $400 | Implemented |
WV0349 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,291 | $1,000 | Implemented |
WV0349 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $3,740 | $1,318 | Implemented |
WV0349 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $200 | Implemented |
WV0349 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,527 | $640 | Implemented |
WV0349 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $48,286 | $39,350 | Implemented |