Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
290
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0487 # 06 Y:1996 | 06 | 1996 | RECYCLE CASTING SAND | $10,179 | $15,000 | Not Implemented |
UD0473 # 01 Y:1995 | 01 | 1995 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,965 | $8,000 | Implemented |
UD0473 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,762 | $2,500 | Not Implemented |
UD0473 # 03 Y:1995 | 03 | 1995 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $5,523 | $7,500 | Not Implemented |
UD0473 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,330 | $18,955 | Not Implemented |
UD0426 # 01 Y:1994 | 01 | 1994 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $24,064 | $500 | Implemented |
UD0426 # 02 Y:1994 | 02 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,565 | $38,000 | Implemented |
UD0426 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,342 | $0 | Not Implemented |
UD0426 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,032 | $400 | Implemented |
UD0426 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,752 | $2,000 | Implemented |
UD0403 # 01 Y:1993 | 01 | 1993 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $17,544 | $50,000 | Implemented |
UD0403 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,715 | $25,000 | Implemented |
UD0403 # 03 Y:1993 | 03 | 1993 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,873 | $202 | Implemented |
UD0403 # 04 Y:1993 | 04 | 1993 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $532 | $250 | Implemented |
UD0364 # 01 Y:1992 | 01 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,100 | $20,000 | Not Implemented |
UD0364 # 02 Y:1992 | 02 | 1992 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,728 | $3,200 | Not Implemented |
UD0364 # 03 Y:1992 | 03 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,314 | $90,000 | Not Implemented |
UD0364 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,121 | $14,430 | Implemented |
UD0213 # 01 Y:1987 | 01 | 1987 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,229 | $20,000 | Implemented |
UD0213 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,000 | $10,000 | Implemented |
UD0213 # 03 Y:1987 | 03 | 1987 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $45,881 | $100,000 | Not Implemented |
UD0213 # 04 Y:1987 | 04 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,036 | $2,000 | Implemented |
UD0213 # 05 Y:1987 | 05 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,181 | $15,000 | Implemented |
UD0214 # 01 Y:1987 | 01 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,963 | $3,000 | Not Implemented |
UD0214 # 02 Y:1987 | 02 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,230 | $800 | Implemented |