IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

290

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0487 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $10,179 $15,000 Not Implemented
UD0473 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,965 $8,000 Implemented
UD0473 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,762 $2,500 Not Implemented
UD0473 # 03 Y:1995 03 1995 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,523 $7,500 Not Implemented
UD0473 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,330 $18,955 Not Implemented
UD0426 # 01 Y:1994 01 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,064 $500 Implemented
UD0426 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $38,000 Implemented
UD0426 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,342 $0 Not Implemented
UD0426 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,032 $400 Implemented
UD0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $2,000 Implemented
UD0403 # 01 Y:1993 01 1993 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $17,544 $50,000 Implemented
UD0403 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,715 $25,000 Implemented
UD0403 # 03 Y:1993 03 1993 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,873 $202 Implemented
UD0403 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $532 $250 Implemented
UD0364 # 01 Y:1992 01 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,100 $20,000 Not Implemented
UD0364 # 02 Y:1992 02 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,728 $3,200 Not Implemented
UD0364 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,314 $90,000 Not Implemented
UD0364 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,121 $14,430 Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented
UD0213 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,000 $10,000 Implemented
UD0213 # 03 Y:1987 03 1987 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $45,881 $100,000 Not Implemented
UD0213 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,036 $2,000 Implemented
UD0213 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,181 $15,000 Implemented
UD0214 # 01 Y:1987 01 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,963 $3,000 Not Implemented
UD0214 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $800 Implemented