Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
197
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0475 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $97,164 | $40,200 | Not Implemented |
WI0475 # 02 Y:2004 | 02 | 2004 | COVER OPEN TANKS | $18,376 | $1,000 | Implemented |
WI0475 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,417 | $33,120 | Implemented |
WI0475 # 04 Y:2004 | 04 | 2004 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,708 | $0 | Not Implemented |
WI0475 # 05 Y:2004 | 05 | 2004 | USE SYNTHETIC LUBRICANT | $4,236 | $0 | Not Implemented |
WI0475 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,127 | $1,976 | Implemented |
WI0475 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,987 | $1,920 | Implemented |
WI0475 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,924 | $80 | Implemented |
WI0475 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,527 | $5,140 | Not Implemented |
WI0469 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,616 | $14,400 | Not Implemented |
WI0469 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,071 | $0 | Implemented |
WI0469 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $626 | $0 | Implemented |
WI0469 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $588 | $249 | Implemented |
WI0469 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $463 | $640 | Not Implemented |
WI0469 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $107 | Implemented |
WI0432 # 01 Y:2002 | 01 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $16,280 | $8,000 | Implemented |
WI0432 # 02 Y:2002 | 02 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $6,896 | $11,000 | n/a |
WI0432 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,700 | $0 | Not Implemented |
WI0432 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,213 | $11,042 | Not Implemented |
WI0432 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,052 | $150 | Implemented |
WI0432 # 06 Y:2002 | 06 | 2002 | REDUCE VENTILATION AIR | $2,842 | $8,000 | Not Implemented |
WI0432 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $957 | $356 | Implemented |
WI0415 # 01 Y:2002 | 01 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,072 | $12,500 | Not Implemented |
WI0415 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,596 | $1,000 | Implemented |
WI0415 # 03 Y:2002 | 03 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,296 | $0 | Not Implemented |