IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0157 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $1,314 $825 Implemented
BD0157 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $507 $1,500 Not Implemented
BD0157 # 05 Y:2000 05 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $19,669 $800 Implemented
BD0157 # 06 Y:2000 06 2000 $9,601 $11,200 Implemented
BD0157 # 07 Y:2000 07 2000 $4,141 $3,250 Not Implemented
ND0343 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,009 $4,500 Not Implemented
ND0343 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,145 $400 Not Implemented
ND0343 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $507 $40 Not Implemented
ND0343 # 04 Y:2000 04 2000 DEVELOP A REPAIR/REPLACE POLICY $8,389 $43,959 Not Implemented
ND0343 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $11,327 $22,922 Not Implemented
ND0343 # 06 Y:2000 06 2000 $-3,501 $6,210 Not Implemented
ND0343 # 07 Y:2000 07 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,533 $250 Not Implemented
UD0585 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,793 $76,500 Not Implemented
UD0585 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,367 $32,550 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,563 $0 Not Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented
UD0585 # 06 Y:2000 06 2000 INSTALL SKYLIGHTS $3,390 $13,560 Not Implemented
UD0585 # 07 Y:2000 07 2000 USE PHOTOCELL CONTROLS $514 $120 Implemented
DS0150 # 01 Y:1999 01 1999 USE OPTIMUM THICKNESS INSULATION $6,312 $2,897 Not Implemented
DS0150 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $512 $483 Not Implemented
DS0150 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,552 $15,640 Implemented
DS0150 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $32,699 $30,301 Implemented
DS0150 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,468 $37,220 Implemented
DS0150 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $626 $400 Not Implemented