IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

290

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0585 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,793 $76,500 Not Implemented
UD0585 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,367 $32,550 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,563 $0 Not Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented
UD0585 # 06 Y:2000 06 2000 INSTALL SKYLIGHTS $3,390 $13,560 Not Implemented
UD0585 # 07 Y:2000 07 2000 USE PHOTOCELL CONTROLS $514 $120 Implemented
UD0573 # 01 Y:1999 01 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $238,622 $0 Implemented
UD0573 # 02 Y:1999 02 1999 RECYCLE CASTING SAND $159,120 $310,000 Implemented
UD0573 # 03 Y:1999 03 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,590 $30,500 Not Implemented
UD0573 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $10,431 $6,000 Not Implemented
UD0573 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,523 $14,669 Implemented
UD0573 # 06 Y:1999 06 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,294 $200 Not Implemented
UD0564 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $220,632 $300,000 Not Implemented
UD0564 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,972 $148 Implemented
UD0564 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,776 $49,660 Not Implemented
UD0564 # 04 Y:1999 04 1999 COVER OPEN TANKS $13,847 $2,400 Implemented
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 06 Y:1999 06 1999 METER WASTE WATER $5,686 $2,200 Not Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $5,096 Not Implemented
UD0564 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $684 Not Implemented
UD0538 # 01 Y:1998 01 1998 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $211,528 $50,000 Implemented
UD0538 # 02 Y:1998 02 1998 MOVE PRODUCT USING MECHANICAL MEANS $44,426 $3,000 Not Implemented
UD0538 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,377 $-10,000 Not Implemented