IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0193 # 11 Y:2001 11 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $27,400 $1,000 Implemented
UM0193 # 12 Y:2001 12 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,010 $1,650 Not Implemented
UM0193 # 13 Y:2001 13 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,000 $4,200 Not Implemented
UM0182 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $57,900 $28,900 Implemented
UM0182 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $43,000 $100,000 Not Implemented
UM0182 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $361 $1,000 Not Implemented
UM0182 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $375 Implemented
UM0159 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,726 $35,000 Not Implemented
UM0159 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,447 $27,000 Implemented
UM0159 # 05 Y:2000 05 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,800 $8,000 Implemented
UM0159 # 04 Y:2000 04 2000 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,390 $4,000 Implemented
UM0159 # 03 Y:2000 03 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $10,836 $3,000 Implemented
UM0159 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172 $50 Implemented
UM0159 # 01 Y:2000 01 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,800 $200 Implemented
UM0142 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $39 $0 Implemented
UM0142 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $450 Implemented
UM0142 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,691 $1,250 Implemented
UM0142 # 04 Y:1999 04 1999 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $55,979 $38,958 Not Implemented
UM0142 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $7,489 $10,860 Implemented
UM0142 # 07 Y:1999 07 1999 METER WASTE WATER $6,412 $500 Implemented
UM0142 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,000 $150,000 Not Implemented
UM0142 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $44,187 $52,200 Not Implemented
UM0060 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,561 $12,818 Not Implemented
UM0060 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,500 $1,607 Implemented
UM0060 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $2,418 $6,182 Not Implemented