IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0193 # 11 Y:2001 11 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $27,400 $1,000 Implemented
UM0193 # 12 Y:2001 12 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,010 $1,650 Not Implemented
UM0193 # 13 Y:2001 13 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,000 $4,200 Not Implemented
UM0193 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,099 $12,877 Not Implemented
AS0297 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $166,920 $35,000 n/a
AS0297 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
AS0297 # 03 Y:2001 03 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $520 $240 Not Implemented
AS0297 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,657 $90,000 n/a
AS0297 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,360 $60 Not Implemented
AS0297 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $5,712 $5,916 Not Implemented
UM0182 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $375 Implemented
UM0182 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $361 $1,000 Not Implemented
UM0182 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $57,900 $28,900 Implemented
UM0182 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $43,000 $100,000 Not Implemented
BD0178 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,764 $9,860 n/a
BD0178 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,182 $0 Implemented
BD0178 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $2,842 $1,800 Implemented
BD0178 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,230 $1,000 Not Implemented
BD0178 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,341 $400 Implemented
BD0178 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $488 Not Implemented
BD0178 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $172 Not Implemented
BD0178 # 08 Y:2001 08 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $20,240 $3,600 Implemented
BD0178 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $551 $200 Not Implemented
BD0178 # 10 Y:2001 10 2001 PAY BILLS ON TIME TO AVOID LATE FEES $537 $0 Not Implemented
SD0262 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,244 $92,000 Not Implemented