Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,106
matching recommendationsSIC | 3363 | Aluminum Die-castings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0157 # 01 Y:2000 | 01 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $3,147 | $2,325 | Not Implemented |
BD0157 # 02 Y:2000 | 02 | 2000 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,952 | $4,600 | Not Implemented |
BD0157 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $1,314 | $825 | Implemented |
BD0157 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $507 | $1,500 | Not Implemented |
BD0157 # 05 Y:2000 | 05 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $19,669 | $800 | Implemented |
BD0157 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $9,601 | $11,200 | Implemented |
BD0157 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $4,141 | $3,250 | Not Implemented |
UD0585 # 01 Y:2000 | 01 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $40,793 | $76,500 | Not Implemented |
UD0585 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,367 | $32,550 | Implemented |
UD0585 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,347 | $100 | Implemented |
UD0585 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,563 | $0 | Not Implemented |
UD0585 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,729 | $16,995 | Implemented |
UD0585 # 06 Y:2000 | 06 | 2000 | INSTALL SKYLIGHTS | $3,390 | $13,560 | Not Implemented |
UD0585 # 07 Y:2000 | 07 | 2000 | USE PHOTOCELL CONTROLS | $514 | $120 | Implemented |
DS0150 # 01 Y:1999 | 01 | 1999 | USE OPTIMUM THICKNESS INSULATION | $6,312 | $2,897 | Not Implemented |
DS0150 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $512 | $483 | Not Implemented |
DS0150 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,552 | $15,640 | Implemented |
DS0150 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $32,699 | $30,301 | Implemented |
DS0150 # 05 Y:1999 | 05 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $29,468 | $37,220 | Implemented |
DS0150 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $626 | $400 | Not Implemented |
DS0150 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $277 | $0 | Implemented |
WI0357 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,443 | $155,500 | Not Implemented |
WI0357 # 02 Y:1999 | 02 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $39,582 | $76,000 | Not Implemented |
WI0357 # 03 Y:1999 | 03 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $25,236 | $60,000 | Not Implemented |
WI0357 # 04 Y:1999 | 04 | 1999 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $24,655 | $10,800 | Implemented |