IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 3364 Nonferrous Die-casting Exc. Aluminum
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0962 # 02 Y:2017 02 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,799 $6,750 Not Implemented
MA0734 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,594 $2,614 Not Implemented
MA0734 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $300 Implemented
MA0734 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,210 Not Implemented
MA0734 # 03 Y:2014 03 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $2,667 $2,565 Not Implemented
MA0734 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,069 $15,975 Not Implemented
MA0734 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,242 $53,572 Not Implemented
BD0425 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $22,668 $34,200 Not Implemented
BD0425 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $28,900 $16,000 Not Implemented
BD0425 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $1,077 Implemented
BD0425 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,547 $50,250 Implemented
BD0425 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $2,445 $4,125 Not Implemented
BD0425 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,044 $3,000 Implemented
BD0425 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $578 $20 Not Implemented
BD0425 # 08 Y:2013 08 2013 USE SYNTHETIC LUBRICANT $1,637 $600 Implemented
MZ0007 # 01 Y:2007 01 2007 COVER OPEN TANKS $2,560 $0 Implemented
MZ0007 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $533 $0 Implemented
MZ0007 # 02 Y:2007 02 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,000 $20,000 Not Implemented
MZ0007 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $5,535 $3,250 Implemented
MZ0007 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,567 $1,310 Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
MA0604 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,796 $67,450 Not Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $33,327 $2,600 Not Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented