IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
MO0182 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $1,273 Implemented
MO0182 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99 $0 Implemented
MO0182 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $827 $0 Implemented
MO0182 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,613 $9,138 Implemented
MO0182 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $9,520 $320 Implemented
BD0049 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,711 $1,500 Implemented
AR0070 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,147 $1,779 Implemented
AR0070 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,430 $3,790 Implemented
AR0070 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,164 $10,900 Implemented
AR0070 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,027 $0 Implemented
AR0070 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,029 $2,250 Implemented
AR0070 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,997 $300 Implemented
AR0070 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,086 $1,000 Implemented
AR0070 # 08 Y:1995 08 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,267 $0 Implemented
AR0070 # 09 Y:1995 09 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $100,584 $0 Implemented
AR0070 # 11 Y:1995 11 1995 MINIMIZE WATER USAGE $840 $200 Implemented
AR0070 # 12 Y:1995 12 1995 MODIFY MATERIAL APPLICATION METHODS $300,000 $3,000 Implemented
MS0033 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $16,206 $7,500 Implemented
MS0033 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,336 $2,170 Implemented
AM0222 # 01 Y:1994 01 1994 COVER OPEN TANKS $10,970 $1,000 Implemented
AM0222 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,300 $1,400 Implemented