IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0298 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $266 Not Implemented
SU0298 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $125 $274 Not Implemented
SU0298 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,873 $81,798 Not Implemented
SU0298 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,123 $45,613 Not Implemented
SU0298 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $4,349 $17,933 Not Implemented
UF0413 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,814 $810 Implemented
UF0413 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,500 $54,000 Implemented
UF0413 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,206 $16,270 Not Implemented
UF0413 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $1,150 $219 Implemented
UF0413 # 05 Y:2008 05 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,800 $1,117 Implemented
UF0413 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,321 $13,321 Implemented
UF0413 # 07 Y:2008 07 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $12,742 $20,000 Not Implemented
UF0413 # 08 Y:2008 08 2008 INSTALL COMMON HEADER ON COMPRESSORS $871 $2,000 Implemented
UF0413 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $151,840 $16,695 Not Implemented
UF0413 # 10 Y:2008 10 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,571 $1,500 Not Implemented
UW0018 # 01 Y:2008 01 2008 UTILIZE JOB COSTING SOFTWARE $55,734 $72,000 Not Implemented
UW0018 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,434 $34,000 Not Implemented
UW0018 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $9,391 $39,900 Not Implemented
UW0018 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $4,328 Not Implemented
UW0018 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,037 $2,775 Not Implemented
IA0423 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,458 $617 Implemented
IA0423 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $443 $25 Implemented
IA0423 # 03 Y:2008 03 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,639 $150 Not Implemented
IA0423 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $86 Implemented
IA0423 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $697 $1,001 Not Implemented