IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0179 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,928 $1,500 Not Implemented
BD0179 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $761 $1,861 Not Implemented
BD0179 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $747 $750 Not Implemented
BD0179 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $416 $0 Not Implemented
BD0179 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $386 $860 Not Implemented
BD0179 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $225 Not Implemented
BD0179 # 08 Y:2001 08 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,402 $500 Not Implemented
BD0179 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,966 $500 Not Implemented
BD0179 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $268 $250 Not Implemented
BD0179 # 11 Y:2001 11 2001 MINIMIZE WATER USAGE $188 $575 Not Implemented
BD0179 # 12 Y:2001 12 2001 PAY BILLS ON TIME TO AVOID LATE FEES $497 $0 Not Implemented
UM0179 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,864 $450 Implemented
UM0179 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $994 $1,250 Not Implemented
UM0179 # 03 Y:2001 03 2001 USE OPTIMUM THICKNESS INSULATION $4,406 $2,264 Not Implemented
UM0179 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,048 $6,185 Not Implemented
UM0179 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,489 $1,400 Not Implemented
UM0179 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,286 $500 Implemented
UM0174 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $4,136 $3,600 Not Implemented
UM0174 # 02 Y:2000 02 2000 USE OPTIMUM THICKNESS INSULATION $5,460 $490 Not Implemented
UM0174 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,906 $1,200 Implemented
UM0174 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,038 $500 Implemented
UM0174 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $530 $350 Implemented
UM0174 # 06 Y:2000 06 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,080 $25,000 Not Implemented
UM0174 # 07 Y:2000 07 2000 MODIFY STARTUP/SHUTDOWN TIMES $7,800 $2,000 Implemented
ND0358 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,922 $8,000 Not Implemented