IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0349 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,291 $1,000 Implemented
WV0349 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,242 $400 Implemented
WV0349 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $13,672 $10,295 Implemented
WV0349 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $14,527 $640 Implemented
WV0349 # 02 Y:2006 02 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $48,286 $39,350 Implemented
WV0349 # 12 Y:2006 12 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $375 $200 Implemented
WV0349 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $1,998 $512 Implemented
WV0349 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $3,740 $1,318 Implemented
UD0696 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,891 $600 Implemented
UD0696 # 10 Y:2004 10 2004 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $845 $0 Implemented
UD0696 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $486 Implemented
UD0696 # 08 Y:2004 08 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $1,617 $0 Implemented
UD0696 # 04 Y:2004 04 2004 ELIMINATE/REDUCE AN OPERATION $9,375 $0 Implemented
UD0678 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,500 $980 Implemented
UD0678 # 08 Y:2003 08 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,745 $2,400 Implemented
UD0678 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $57,760 $0 Implemented
UD0678 # 11 Y:2003 11 2003 DISCONNECT BALLASTS $1,865 $90 Implemented
UD0678 # 10 Y:2003 10 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,251 $2,000 Implemented
UD0678 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,900 $725 Implemented
UD0678 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,840 $0 Implemented
UD0678 # 09 Y:2003 09 2003 INSTALL TIMERS AND/OR THERMOSTATS $2,654 $1,000 Implemented
WV0266 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,937 $79 Implemented
WV0266 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $2,550 Implemented
WV0266 # 14 Y:2003 14 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $39,573 $0 Implemented
WV0266 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,846 $250 Implemented