Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 3365 | Aluminum Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0174 # 07 Y:2000 | 07 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $7,800 | $2,000 | Implemented |
UM0174 # 06 Y:2000 | 06 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,080 | $25,000 | Not Implemented |
UM0174 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $530 | $350 | Implemented |
UM0174 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,038 | $500 | Implemented |
UM0174 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,906 | $1,200 | Implemented |
UM0174 # 02 Y:2000 | 02 | 2000 | USE OPTIMUM THICKNESS INSULATION | $5,460 | $490 | Not Implemented |
UM0174 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $4,136 | $3,600 | Not Implemented |
ND0358 # 03 Y:2000 | 03 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $164 | $400 | Not Implemented |
ND0358 # 08 Y:2000 | 08 | 2000 | INSTALL OCCUPANCY SENSORS | $78 | $200 | Not Implemented |
ND0358 # 07 Y:2000 | 07 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,479 | $280 | Not Implemented |
ND0358 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,588 | $555 | Not Implemented |
ND0358 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,996 | $300 | Not Implemented |
ND0358 # 04 Y:2000 | 04 | 2000 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $67 | $30 | Not Implemented |
ND0358 # 02 Y:2000 | 02 | 2000 | BURN A LESS EXPENSIVE GRADE OF FUEL | $11,307 | $39,100 | Not Implemented |
ND0358 # 01 Y:2000 | 01 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,922 | $8,000 | Not Implemented |
SD0253 # 07 Y:2000 | 07 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $22,500 | $15,000 | Not Implemented |
SD0253 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,732 | $5,400 | Not Implemented |
SD0253 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,622 | $7,000 | Not Implemented |
SD0253 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $20,080 | $25,000 | Not Implemented |
SD0253 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,706 | $15,000 | Not Implemented |
SD0253 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $108,760 | $68,000 | Not Implemented |
SD0253 # 04 Y:2000 | 04 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,561 | $12,000 | Not Implemented |
UD0601 # 01 Y:2000 | 01 | 2000 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $138,600 | $0 | Implemented |
UD0601 # 06 Y:2000 | 06 | 2000 | INSTALL SKYLIGHTS | $4,676 | $6,300 | Not Implemented |
UD0601 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $6,241 | Not Implemented |